| Sector | abcPower Plant | Tender Value | INR 57.42 Lakhs | Location | Maharashtra - India | Ref.No | 21534802 | Closing Date | 28 - Feb - 2017 | | | Restrengthening of rope way multi- storied buildings with other misc walls at TPS . Procurement of bowl and bowl hub for XRP 803 ½ HP coal mills at unit no 1-2. Supply of air drier controller and various transmitter to C& I-11. 500 MW. Overhauling of HP I LP valves during annual overhaul of Unit No 2. Servicing of buck stay assemblies including repair to stirrp assembly, movement arrestor & lug plate assembly during Unit No 2. Application of rock wool mattresses & MS ribbed sheet 1 GI sheet during AOH of Unit No.-2. Work of maintenance of air pre- heater during annual overhaul of Unit No 2. Servicing of PA fan & ID fan during Unit No.-2 AOH. Application of chemical bonded refractory in APH outlet to ESP inlet duct during Unit No -2 annual AOH. Servicing of gates & dampers of air & flue gas path during annual AOhi of Unit No.-2. Work of insitu repair of critical valve & insitu reconditioning of main steam stop valve during Unit No,-2AOH. Repair of APH outlet inlet duct to ESP inlet duct by replacement of eroded plates & replacement of bracings & supports during annual AOH of Unit No.-1 AOH. Servicing of burner tilt assembly. replacement of coal compartment & repair of wind box air and oil corm.-i-artment at Unit No,-2 during AOH. Supply & work of cold air velocity test CAVT at APH outlet to ESP inlet duct, installation of diverter plates and fabric expansion joint in Unit No.-2 AOH. Work of non destructive (NOT) such as ultrasonic test a P. test, radio-graphic interpretation and tube thicknes survey boiler CDS tubes for Unit No. 2 &4. Procurement of vertical sump pumps along with electric motor for handling ash water. Procurement of spares for transport air compressor & instrument air compressor for AHP-I. Providing of ESP fluidizing blower (Roots blower) with motor & foundation for AHP-I. Supply 90 Deg. & 45 Deg alloy C. I. 450 BHN bends for BA grinder discharge line of AHP-II, Unit-5 (500 MW). Procurement of conical valve set & lock nut of Geho pump for AHP I. Procurement of helical gear box & its spares for single roll clinker grinder at 210 MWAHP-I. Procurement of ash intake vale 200 NB & vent valves 100 NB 50 NB rubber seat body flaps & spring for AHP-I,. Procurement of various consumable (i.e. rubber bush & braided hoses) required for Ash Slurry disposal system for Stage-I at AHP-I. Supply of B. A. hopper feed gat frame seal & power cylinder seal kit for AHP-11,, Unit-5 (500 MW). Supply of snap type cages & filter bags for buffer hopper of vacuum based dry fly ash evacuation system atAHP-II, Unit-5, TPS. Turbine and Boiler side LY motor overhaul of Unit-2 & 4 during annual overhaul (Short Shutdown). Work of modification of existing ILMS in CHP2 500 MW TPS. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|