| Sector | abcPower Plant | Tender Value | INR 40.23 Lakhs | Location | Maharashtra - India | Ref.No | 23888926 | Closing Date | 31 - Jul - 2017 | | | Procurement of heavy Dutt Abrasive resistant Submersible Pump & Hoses for handling of coal Particles with Slurry for Chp-II, 500 mw tps. Procurement of Consumable material for EM-II Section 500 mw. Replacement of Water Wall soot Blower At unit no. 4 in coh. Supply of Straight PF Pipes & Center feed pipes for XRP 803 ½ Ho Coal Mill at Unit no. 1 & 2. Procurement of Scrapper hub, Scrapper hub, Scrapper Pin, base plate & Scrapper plate for Xrp 803 coal mill unit no. 1 & 2. Annual Work Contract for re Babbitting of Worn Out Pillow, block Bearing of PA fan NDV TIEDSTACk at unit 1 & 2. Work of Complete replacement of Economizer Coils in unit no. 4 Coh. Work of Reconditioning/ overhauling of High Pressure Water Pumps at Ahp-1. AWC for various Works in ESP Internal During annual Overhaul of unit 1 to 4 (Considering 2 units). Work of Coal Nozzle assy. Replacement duing Coh fy 2018-19 at U 5, 500 mw, tps. Work Contract for Attending Boiler Tube leakage by Hp Welding During Forced breakdown As & When Required basis at unit no. 5 (500 mw), tps. Procurement of Fire- create & Chemicals bonded refractory at unit-5, 500 mw, tps. Procurement of Spares for Cooling Tower. Supply of Spares Required for VFD Panels of Conv. 2C & 2D in chp-I. Work of Bunker neack Choke up Removal & Allied work in unit no. 1 to 4. Supply of Consumables Required For 500 mw, tps. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|