Product Detail :
|
Supply of Neoprene rubber air side diaphragms & gasket ~ at WTP-500 MW TPS. Maintenance contract for computers & printers of max DNA & various PLC's ~ at 500 MW, TPS.Work of replacement of coal feeder discharge chute of 36" gravimeter coal feeder ~ at Unit-5 (500 MW) TPS. Work of rebabbitting of ID fan motor bearings ~ at Unit- 5, TPS. Supply of vent fan assembly with drive motor & base frame for installation at dry fly ash collection silo ~ at AHP-11, Unit-5 (500 MW) TPS. Providing detailed layout plan of area including carrying out contour survey & detailed engineering to find out the balance capacity of Waregaon ash bund ~ at TPS. Cleaning of natural nallah from Kamptee road bridge ~ near Waregaon village to Kanhan river junction mouth by removing accumulated ash/shrubs. Supply of local control stations & push buttons for motorized actuators for 210 MW TPS. Procurement of chemical bonded & fire create
refractory ~ for unit no.-3 AOH. Alignment & locking of PSH & FSH & RH coils pendent assembly by carrying high pressure welding at lays & connectors spacing ~ in unit no.-3 & 4 shut down & AOH. Comprehensive annual maintenance service contract for H2 driers, SWAS lab chillers & packaged AC installed ~ at Unit No.-5 of TPS. Procurement of Vbelts ~ at AHP-I. Work of reconditioning overhauling of high pressure water pump model SDD-250/350 beacon weir ~ . Strengthening of bottom ash hopper including replacement of MS plates beams and channels ~ of Unit-3 & 4 during AOH. Procurement of spares for BFP main pumps & booster pumps installed ~ at 500 MW unit. Supply of spares for E&H make vortex flow meter ~ for 210 MW TPS. Repair of boiler skin casing at crown plate, seal plate & scalloped bar ~ unit no.-3 & 4 AOH. Servicing of buck stay assemblies including repair to stirrup assembly, leveler guide assembly movement arrestor & lug plate assembly ~ in Unit No.- 3 & 4AOH. Procurement of sub body assemblies of actuator of secondary air damper of FD fan in 210 MW units ~ at TPS.(Any standard make). Procurement of reject conveying line pipe & transporting vessels for coal mill reject handling system ~ of BM-II (500 MW) TPS. Work of misc welding nature complaints of staff quarters as & when required basis ~ at colony TPS.
|