| Sector | abcCivil Works | Tender Value | INR 2.52 Crore | Location | Uttaranchal - India | Ref.No | 86919395 | Closing Date | 22 - Sep - 2025 | | | Construction work of RCC motor bridge at Km 05 of Bhagwatitalaiya Kamaliya Saraikhet motor road under the assembly constituency Chaubattakhal of district Pauri Garhwal under the state plan Construction work of RCC motor bridge at Km 05 of Bhagwatitalaiya-Kamaliya-Saraikhet motor road under the assembly constituency Chaubattakhal of district Pauri Garhwal under the state plan, - Construction work of RCC motor bridge at Km 05 of Bhagwatitalaiya-Kamaliya-Saraikhet motor road under the assembly constituency Chaubattakhal of district Pauri Garhwal under the state plan, Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.), Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock (blasting probhited ) Mechanical Means, Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications), SUB HEAD III Approach work, SUB HEAD I FOUNDATION/SUBSTRUCTURE & SUPERSTRUCTURE WORK OF ABUTMENTS, Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M35 Height above 10m With Batching Plant, Transit Mixer and Concrete Pump, Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC/PSC Grade M-40 Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure, Height above 10m, Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications, Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification, Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC/ PSC Grade M35 Using Batching Plant, Transit Mixer and Concrete For solid slab super-structure Pump Height above 10m, Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications, Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (Asper PWD Uttarakhand specifications), Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ), White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915, SUB HEAD I FOUNDATION/SUBSTRUCTURE & SUPERSTRUCTURE WORK OF ABUTMENTS (MARKET ITEM), FIXED BEARING - 163.58 Tonne, Mastic Asphalt 65mm thick, Drainage Spouts complete as per drawing and Technical specification, GUIDED BEARING LONG - 163.58 Tonne, Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications, SUB HEAD II TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES, Supplying, fitting and fixing in position true to line and level POT-PTFE bearing (Excluding Cost of Bearing) consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC 83 part-I & II respectively and other parts conforming to BS 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications, Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope a |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|