Product Detail :
|
TGGENCO-YTPS(5X800 MW)-BE-III- Removal and re-fixing of rock wool insulation mattresses and metal claddings , along with replacement of castable refractory at various locations of Unit-3 Boiler, during tube leaks, other emergency works and Removal and replacement of insulation, cladding sheets at locations such as Air-Pre heater , ESPs, PA, SA, FG Ducts and at Hopper (Eco, SCR, APH, Duct, ESP) areas in Unit-3 Boiler as and when required from the actual date of commencement to 31.03.2027
|