Product Detail :
|
Application of refractory material in cfbc boiler at kltps, unit 4 as and when required for 12 months period. Work of manual removal of bottom ash from bottom ash hopper of boiler 3 by means of manual efforts & dumper and disposing of same at outside ph site.
|