Tender Corrigendum :
|
Tender Corrigendum | DATES | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Deadline has been changed from 20/10/2021 00:00:00 to 22/10/2021 00:00:00 AM DATES | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers |
|
Product Detail :
|
Provision of lumpsum jobs for dht sru ta, blinding and deblinding, piping - cs fillet joint, as/ss fillet joi, fillet joint mon, cs fillet joint, cs corrosion pad, as/ss corrosion, wrap coating using "pykot. nozzle replacement/provis, gusset fabrication, cs rf pad, non-pressurized piping, grit blasting, dye penetrant test, radiography on piping wit, radiography film devolopm, overlay patch work, replacement of casing plate, weld build up cs, system scaffolding, stack scaffolding, cement lining repairs, fabrication of pipie fabr, cement lining of straight, cement lining touch ups, dismantling of structure, rolling of plates, replacement of foundation, replacement of liner plate, re-tubing of exchangers and coolers, tube test of exchanger, dropping, gasket replacement and refixing of floating head cover or channel cover, dropping, gasket replacement and refixing of floating head cover, arresting exchanger gasket leak, dropping n re-installation of control valves, suction strainer cleaning, replacement of column wear plate /chute plate, dropping n reinstallation of valves, removal of old insulation including cleaning for inspection, supply and painting of wrapping of 0.18mm aluminium foil, supply and fixing of new lrb mineral wool, supply n fix new al plain sheet 22 swg, supply n fixing of rope insulation on 1/2" pipe, casting of refractory - thickness, replacement of ceramic blanket replacement, chipping n removal and gunning of refractory, fabrication of ss anchors, welding of ss anchors, brick lining, supply of diesel air compressor, usage of gully sucker for draining out oil/water/sludge/slurry from the unit, supply of necessary intrinsically safe de-watering pumps, fabrication n installation of burner components, manpower, valve servicing, seal welding of as/ss exchanger tube, hydrojet cleaning of afc bundle, additional afc plug removal n fixing, constant load / variable load spring supports servicing, flushing of lines with any liquid media, carboard blasting of lines.
|